Table of Contents
Articles
ESTIMASI WAKTU KEDATANGAN TSUNAMI BERDASARKAN PATAHAN SEGMEN ACEH-ANDAMAN UNTUK DARATAN PANTAI UTARA ACEH
DOI : 10.32679/jth.v13i2.715
Benazir Benazir, Kuswandi Kuswandi, Muhammad Hafiz Aslami, M. Faisi Ikhwali, Siti Nurul Hijah
|
65-76
|
PREDICTION MODEL FOR TIDAL FLOOD CONTROL USING ONE-WAY COUPLING SCHEME IN PONTIANAK, WEST KALIMANTAN
DOI : 10.32679/jth.v13i2.707
Randy Ardianto, Aris Ismanto, Sugeng Widada, Joko Sampurno
|
77-88
|
DESAIN JARINGAN POMPA IRIGASI PADA RAWA PASANG SURUT DENGAN HIDROTOPOGRAFI B/C (STUDI KASUS DIR. DANDA)
DOI : 10.32679/jth.v13i2.700
Indra Setya Putra, Nurlia Sadikin, Arif Dhiaksa
|
89-102
|
OPTIMASI PERENCANAAN SISTEM DRAINASE KAWASAN INDUSTRI DI CIKARANG, KABUPATEN BEKASI, JAWA BARAT
DOI : 10.32679/jth.v13i2.712
Angela Grace, Doddi Yudianto, Finna Fitriana
|
103-112
|
113-126
|